IS WORK OVER?

Automation index

How much of a Automation engineer’s job can AI already do?

A PLC and a SCADA come earlier. Leaving the plant in auto without it tripping do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Automation engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
PLC, SCADA and the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Panel, loops and the lying sensor.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
FAT, SAT and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Recipes, batches and the product change.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The shift, the alarm and not bypassing the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not trip, and documenting the program.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program PLCs
  • SCADA
  • interlocks
  • control loops
  • FAT SAT
  • commissioning
  • plant alarms
  • automation panels

Sources for this job· O*NET 17-3024.00· ESCO/ISCO 2149

Tiler

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Layout, levels and ordering tile.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Cut, set and grout.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Substrates, falls and awkward points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, client and not staining the house.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Quantities, extras and logs.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a floor that sounds hollow.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Layout, levels and ordering tile
  • Cut, set and grout
  • Substrates, falls and awkward points
  • Site, client and not staining the house
  • Quantities, extras and logs
  • Not leaving a floor that sounds hollow
  • solador

Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7122

Analyse my job

Jobs with similar scores

  1. 156Wealth manager27%
  2. 157Printing press operator27%
  3. 158Food engineer27%
  4. 160Energy engineer27%
  5. 161Packaging engineer27%
  6. 162Materials engineer27%