Automation index
How much of a Automation engineer’s job can AI already do?
A PLC and a SCADA come earlier. Leaving the plant in auto without it tripping do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Automation engineer
27%
AI can already do 27% of this job.
#159 / 623
View rankingAutomation engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
PLC, SCADA and the interlock.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Panel, loops and the lying sensor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
FAT, SAT and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Recipes, batches and the product change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The shift, the alarm and not bypassing the interlock.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not trip, and documenting the program.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- program PLCs
- SCADA
- interlocks
- control loops
- FAT SAT
- commissioning
- plant alarms
- automation panels
Sources for this job· O*NET 17-3024.00· ESCO/ISCO 2149
IS WORK OVER?
Wall tiler
19%
#471 / 623
View rankingWall tiler
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, level and the tile format.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Adhesive, set and the tray fall.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Cut, drill and the tile that splits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Grout, seal and the bath junction.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the model change and the stock that is late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No ugly cut, and no leak.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tile walls
- set out joints
- bed tiles
- tray fall
- seal junctions
- cut tiles
- drill tile
- grout
Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7122