Automation index
How much of a Aviation medical examiner’s job can AI already do?
A medical comes earlier. Calling whether they fly without signing a pilot who will drop do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Aviation medical examiner
27%
AI can already do 27% of this job.
#191 / 753
View rankingAviation medical examiner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Medical, the rule and the certificate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
ECG, the doubt and the one who hides it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Psychology, sleep and drink.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restriction, the licence and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The airline, the pressure and not yielding.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
If they fly, sign it. And not the one who will drop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- aviation medicals
- pilot ECG
- licence restrictions
- sleep
- drink
- AME exam
- not yield
- EASA rule
Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212
IS WORK OVER?
Facilities engineer
22%
#392 / 753
View rankingFacilities engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
CMMS, tickets and the PPM.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Roof, the chiller and the one that will not start.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Generator, the diesel and not leaving it dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fire, the pump and the monthly test.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The tenant, August and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That cooling does not die, and not leaving the generator dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- CMMS
- PPM
- chillers
- generators
- diesel
- fire pumps
- roofs
- tickets
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149