Automation index
How much of a Avionics technician’s job can AI already do?
A BITE comes earlier. Calibrating the kit and signing that it flies do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Avionics technician
22%
AI can already do 22% of this job.
#391 / 643
View rankingAvionics technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
BITE, manual and the fault tree.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Bench, the pin and the oxidised connector.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Calibrate, software and the config.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Line, the aircraft on stand and the slot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The pilot report and not swapping the box blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Sign that it flies, and not leaving BITE red.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- BITE
- calibrate avionics
- connectors
- fault tree
- equipment software
- the stand
- LRUs
- config
Sources for this job· O*NET 49-2091.00· ESCO/ISCO 7421
IS WORK OVER?
Boiler technician
20%
#478 / 643
View rankingBoiler technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, fault codes and spares.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 35% | +5.6 |
Routes, appointments and permits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Diagnose, open and repair the boiler.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 12% | +2.6 |
Tune-up, combustion and pressures.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Clients, porters and plant-room access.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Gas, safety and not leaving the building cold.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Logs, fault codes and spares
- Routes, appointments and permits
- Diagnose, open and repair the boiler
- Tune-up, combustion and pressures
- Clients, porters and plant-room access
- calderas
- tecnico de calderas
- calefaccion central
Sources for this job· O*NET 49-9021.00· ESCO/ISCO 7126