IS WORK OVER?

Automation index

How much of a Avionics technician’s job can AI already do?

A BITE comes earlier. Calibrating the kit and signing that it flies do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Avionics technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
BITE, manual and the fault tree.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Bench, the pin and the oxidised connector.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Calibrate, software and the config.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Line, the aircraft on stand and the slot.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The pilot report and not swapping the box blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Sign that it flies, and not leaving BITE red.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • BITE
  • calibrate avionics
  • connectors
  • fault tree
  • equipment software
  • the stand
  • LRUs
  • config

Sources for this job· O*NET 49-2091.00· ESCO/ISCO 7421

Cloud architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagrams, ADRs and a first IaC pass.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Cost estimate, Well-Architected and gaps.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Review PRs, security and network.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Align with security, finops and product.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
PoCs, real failures and vendor limits.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sign the design and own the incident.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Diagrams, ADRs and a first IaC pass
  • Cost estimate, Well-Architected and gaps
  • Review PRs, security and network
  • Align with security, finops and product
  • PoCs, real failures and vendor limits
  • Sign the design and own the incident
  • arquitecto cloud

Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 379Cider maker22%
  2. 380Heat-pump technician22%
  3. 381Water technician22%
  4. 383Calibration technician22%
  5. 384PCB technician22%
  6. 385Appliance technician22%