Automation index
How much of a Avionics technician’s job can AI already do?
A BITE comes earlier. Calibrating the kit and signing that it flies do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Avionics technician
22%
AI can already do 22% of this job.
#468 / 753
View rankingAvionics technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
BITE, manual and the fault tree.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Bench, the pin and the oxidised connector.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Calibrate, software and the config.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Line, the aircraft on stand and the slot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The pilot report and not swapping the box blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Sign that it flies, and not leaving BITE red.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- BITE
- calibrate avionics
- connectors
- fault tree
- equipment software
- the stand
- LRUs
- config
Sources for this job· O*NET 49-2091.00· ESCO/ISCO 7421
IS WORK OVER?
Facilities engineer
22%
#392 / 753
View rankingFacilities engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
CMMS, tickets and the PPM.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Roof, the chiller and the one that will not start.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Generator, the diesel and not leaving it dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fire, the pump and the monthly test.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The tenant, August and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That cooling does not die, and not leaving the generator dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- CMMS
- PPM
- chillers
- generators
- diesel
- fire pumps
- roofs
- tickets
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149