Automation index
How much of a Avionics technician’s job can AI already do?
A BITE comes earlier. Calibrating the kit and signing that it flies do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Avionics technician
22%
AI can already do 22% of this job.
#382 / 633
View rankingAvionics technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
BITE, manual and the fault tree.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Bench, the pin and the oxidised connector.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Calibrate, software and the config.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Line, the aircraft on stand and the slot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The pilot report and not swapping the box blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Sign that it flies, and not leaving BITE red.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- BITE
- calibrate avionics
- connectors
- fault tree
- equipment software
- the stand
- LRUs
- config
Sources for this job· O*NET 49-2091.00· ESCO/ISCO 7421
IS WORK OVER?
Production engineer
25%
#233 / 633
View rankingProduction engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
OEE, sequence and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Line, changeovers and the micro-stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Layout, times and the work standard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Supervisors, unions and the shift that turns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In-line quality and the batch that cannot ship.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Hit the plan, and not dressing the OEE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- OEE
- sequence production
- changeovers
- layout
- work standards
- micro-stops
- shift plan
- in-line quality
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141