IS WORK OVER?

Automation index

How much of a Avionics technician’s job can AI already do?

A BITE comes earlier. Calibrating the kit and signing that it flies do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Avionics technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
BITE, manual and the fault tree.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Bench, the pin and the oxidised connector.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Calibrate, software and the config.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Line, the aircraft on stand and the slot.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The pilot report and not swapping the box blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Sign that it flies, and not leaving BITE red.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • BITE
  • calibrate avionics
  • connectors
  • fault tree
  • equipment software
  • the stand
  • LRUs
  • config

Sources for this job· O*NET 49-2091.00· ESCO/ISCO 7421

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 458Non-commissioned officer22%
  2. 459Heat-pump technician22%
  3. 460Water technician22%
  4. 462Calibration technician22%
  5. 463PCB technician22%
  6. 464Dietetic technician22%