Automation index
How much of a Avionics technician’s job can AI already do?
A BITE comes earlier. Calibrating the kit and signing that it flies do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Avionics technician
22%
AI can already do 22% of this job.
#382 / 633
View rankingAvionics technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
BITE, manual and the fault tree.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Bench, the pin and the oxidised connector.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Calibrate, software and the config.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Line, the aircraft on stand and the slot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The pilot report and not swapping the box blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Sign that it flies, and not leaving BITE red.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- BITE
- calibrate avionics
- connectors
- fault tree
- equipment software
- the stand
- LRUs
- config
Sources for this job· O*NET 49-2091.00· ESCO/ISCO 7421
IS WORK OVER?
Solar installer
21%
#425 / 633
View rankingSolar installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Roof study, shade and quote.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 42% | +7.6 |
Permits, reports and orders.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Fit structure, modules and cabling on roofs.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Inverter, commissioning and measurements.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Heights, anchors and weather.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Client, community and easements.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Roof study, shade and quote
- Permits, reports and orders
- Inverter, commissioning and measurements
- Heights, anchors and weather
- Client, community and easements
- placas solares
- instalador fotovoltaico
- solar installer
Sources for this job· O*NET 47-2231.00· ESCO/ISCO 7411