Automation index
How much of a Avionics technician’s job can AI already do?
A BITE comes earlier. Calibrating the kit and signing that it flies do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Avionics technician
22%
AI can already do 22% of this job.
#382 / 633
View rankingAvionics technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
BITE, manual and the fault tree.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Bench, the pin and the oxidised connector.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Calibrate, software and the config.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Line, the aircraft on stand and the slot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The pilot report and not swapping the box blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Sign that it flies, and not leaving BITE red.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- BITE
- calibrate avionics
- connectors
- fault tree
- equipment software
- the stand
- LRUs
- config
Sources for this job· O*NET 49-2091.00· ESCO/ISCO 7421
IS WORK OVER?
Soldier
14%
#628 / 633
View rankingSoldier
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, written orders and paper logistics.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Classroom drill and simulators.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Physical drill, weapons and field.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 6% | +1.3 |
Operations, watch and deployment.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 8% | +1.4 |
Unit life, discipline and comrades.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Command or be commanded in a real incident.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 14% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Logs, written orders and paper logistics
- Classroom drill and simulators
- Physical drill, weapons and field
- Operations, watch and deployment
- Unit life, discipline and comrades
- Command or be commanded in a real incident
- militar
- soldado
- soldier
- ejercito
Sources for this job· O*NET 55-1011.00· ESCO/ISCO 0110