Automation index
How much of a Banker’s job can AI already do?
A score and a dossier come earlier. Looking the client in the eye, saying no, and owning the risk do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Banker
27%
AI can already do 27% of this job.
#135 / 623
View rankingBanker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Client file, scoring and desk KYC.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Product proposals, simulation and reporting.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Meetings, negotiation and close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Risk calls, exceptions and escalation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Compliance, audit and the file.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
Book, referrals and long relationship.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Client file, scoring and desk KYC
- Meetings, negotiation and close
- Risk calls, exceptions and escalation
- Compliance, audit and the file
- Book, referrals and long relationship
- banquero
- banker
- gestor de banca
- private banker
Sources for this job· O*NET 13-2052.00· ESCO/ISCO 2412
IS WORK OVER?
Mining engineer
22%
#341 / 623
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146