Automation index
How much of a Barber’s job can AI already do?
The booking is already in an app. The fade, the straight-razor shave and the chair talk are not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Barber
12%
AI can already do 12% of this job.
#642 / 643
View rankingBarber
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Appointments, till and product stock.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 32% | +4.5 |
Cut and style consult with the client.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Cut, fade and finish with clipper and scissors.EstimateNo public source provides a precise figure. This is our estimate. | 28% | 5% | +1.4 |
Shave, beard tidy and hot towel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 6% | +1.1 |
Cleaning, disinfection and tool care.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
Shop atmosphere and regulars.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 14% | +1.7 |
| Total | 100% | 12% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cut hair
- colour hair
- haircut
- barbering
- Appointments, till and product stock
- Cut and style consult with the client
- Shave, beard tidy and hot towel
- Cleaning, disinfection and tool care
- Shop atmosphere and regulars
- barber
Sources for this job· O*NET 39-5011.00· ESCO/ISCO 5141
IS WORK OVER?
Electrical engineer
25%
#241 / 643
View rankingElectrical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, single-line diagram and selectivity.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Project, quantities and electrical spec.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Site, contractors and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Measurements, thermography and faults.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Code, quality and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign and own the installation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- install wiring
- electrical panels
- repair faults
- Project, quantities and electrical spec
- Site, contractors and commissioning
- Measurements, thermography and faults
- Code, quality and documentation
- Sign and own the installation
- ingeniero electrico
Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151