IS WORK OVER?

Automation index

How much of a Battery technician’s job can AI already do?

A BMS comes earlier. Diagnosing the module without setting the bank on fire do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Battery technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
BMS, SOH and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Module, the imbalance and the one that swells.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Shop, isolation and not shorting.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Thermal, the fire and the protocol.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The vehicle, the warranty and not swapping blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No fire, and the module right.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • BMS
  • SOH
  • modules
  • imbalance
  • swelling
  • isolation
  • thermal fire
  • battery warranty

Sources for this job· O*NET 17-3023.00· ESCO/ISCO 3113

Cloud architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagrams, ADRs and a first IaC pass.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Cost estimate, Well-Architected and gaps.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Review PRs, security and network.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Align with security, finops and product.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
PoCs, real failures and vendor limits.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sign the design and own the incident.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Diagrams, ADRs and a first IaC pass
  • Cost estimate, Well-Architected and gaps
  • Review PRs, security and network
  • Align with security, finops and product
  • PoCs, real failures and vendor limits
  • Sign the design and own the incident
  • arquitecto cloud

Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 534Well driller19%
  2. 535Woodcarver19%
  3. 536Wind-turbine technician19%
  4. 538Biogas technician19%
  5. 539Hydrogen technician19%
  6. 540Small-hydro technician19%