Automation index
How much of a Battery technician’s job can AI already do?
A BMS comes earlier. Diagnosing the module without setting the bank on fire do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Battery technician
19%
AI can already do 19% of this job.
#660 / 763
View rankingBattery technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
BMS, SOH and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Module, the imbalance and the one that swells.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Shop, isolation and not shorting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Thermal, the fire and the protocol.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The vehicle, the warranty and not swapping blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No fire, and the module right.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- BMS
- SOH
- modules
- imbalance
- swelling
- isolation
- thermal fire
- battery warranty
Sources for this job· O*NET 17-3023.00· ESCO/ISCO 3113
IS WORK OVER?
Geomatics engineer
22%
#412 / 763
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165