Automation index
How much of a Battery technician’s job can AI already do?
A BMS comes earlier. Diagnosing the module without setting the bank on fire do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Battery technician
19%
AI can already do 19% of this job.
#547 / 643
View rankingBattery technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
BMS, SOH and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Module, the imbalance and the one that swells.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Shop, isolation and not shorting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Thermal, the fire and the protocol.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The vehicle, the warranty and not swapping blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No fire, and the module right.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- BMS
- SOH
- modules
- imbalance
- swelling
- isolation
- thermal fire
- battery warranty
Sources for this job· O*NET 17-3023.00· ESCO/ISCO 3113
IS WORK OVER?
Industrial engineer
28%
#102 / 643
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141