IS WORK OVER?

Automation index

How much of a Battery technician’s job can AI already do?

A BMS comes earlier. Diagnosing the module without setting the bank on fire do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Battery technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
BMS, SOH and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Module, the imbalance and the one that swells.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Shop, isolation and not shorting.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Thermal, the fire and the protocol.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The vehicle, the warranty and not swapping blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No fire, and the module right.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • BMS
  • SOH
  • modules
  • imbalance
  • swelling
  • isolation
  • thermal fire
  • battery warranty

Sources for this job· O*NET 17-3023.00· ESCO/ISCO 3113

NDT technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Procedure, technique and the part.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Test, the indication and the one that hides.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Report, the size and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Field, the scaffold and the access.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The welder, the rush and not signing it sound.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
See the defect, and a true report.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • NDT
  • ultrasound
  • indications
  • procedures
  • scaffold
  • test reports
  • defect size
  • access

Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119

Analyse my job

Jobs with similar scores

  1. 544Well driller19%
  2. 545Woodcarver19%
  3. 546Wind-turbine technician19%
  4. 548Biogas technician19%
  5. 549Hydrogen technician19%
  6. 550Small-hydro technician19%