IS WORK OVER?

Automation index

How much of a Battery technician’s job can AI already do?

A BMS comes earlier. Diagnosing the module without setting the bank on fire do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Battery technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
BMS, SOH and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Module, the imbalance and the one that swells.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Shop, isolation and not shorting.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Thermal, the fire and the protocol.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The vehicle, the warranty and not swapping blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No fire, and the module right.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • BMS
  • SOH
  • modules
  • imbalance
  • swelling
  • isolation
  • thermal fire
  • battery warranty

Sources for this job· O*NET 17-3023.00· ESCO/ISCO 3113

Train conductor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Consist, brakes and the departure sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Platform, close-up and the one left outside.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Incidents, Control and the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Ticket staff, the fare dodger and the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The line, the points and not leaving early.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Leave nobody behind, and sign the consist.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • train consist
  • platform close-up
  • departure sheet
  • Control
  • brake check
  • line incidents
  • halts
  • delays

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312

Analyse my job

Jobs with similar scores

  1. 544Well driller19%
  2. 545Woodcarver19%
  3. 546Wind-turbine technician19%
  4. 548Biogas technician19%
  5. 549Hydrogen technician19%
  6. 550Small-hydro technician19%