Automation index
How much of a Battery technician’s job can AI already do?
A BMS comes earlier. Diagnosing the module without setting the bank on fire do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Battery technician
19%
AI can already do 19% of this job.
#670 / 773
View rankingBattery technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
BMS, SOH and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Module, the imbalance and the one that swells.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Shop, isolation and not shorting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Thermal, the fire and the protocol.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The vehicle, the warranty and not swapping blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No fire, and the module right.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- BMS
- SOH
- modules
- imbalance
- swelling
- isolation
- thermal fire
- battery warranty
Sources for this job· O*NET 17-3023.00· ESCO/ISCO 3113
IS WORK OVER?
Tunnel engineer
22%
#420 / 773
View rankingTunnel engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Heading, the geology and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Water, the inflow and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Blast, the vibration and the building.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Segment, the ring and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not come down, and not hiding the water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tunnel headings
- support
- inflows
- blasts
- segments
- tunnel geology
- rings
- vibrations
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142