Automation index
How much of a Beekeeper’s job can AI already do?
A hive log comes earlier. Checking without angering them and taking honey do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Beekeeper
21%
AI can already do 21% of this job.
#486 / 733
View rankingBeekeeper
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Check, queen and the hive log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Honey, supers and the smoker.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Varroa, treatments and not losing the stand.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Moving hives, bloom and the move.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The neighbour, the sting and the field permit.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Take honey, and not leaving them without stores.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- check hives
- supers
- varroa
- moving hives
- smoker
- queen
- bloom
- the stand
Sources for this job· O*NET 45-2092.00· ESCO/ISCO 6123
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142