Automation index
How much of a Bellhop’s job can AI already do?
A luggage tag comes earlier. Getting them up whole without losing the one at the back do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Bellhop
19%
AI can already do 19% of this job.
#482 / 633
View rankingBellhop
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tag, bags and the floor map.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Up, the lift and the one that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Room, the VIP and not going in unannounced.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Tip, the shift and the one who hides.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The group, the coach and not leaving one in the lobby.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Whole, and not losing the one at the back.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- bags
- floors
- the lift
- VIP
- tips
- lobby
- groups
- luggage tags
Sources for this job· O*NET 43-4081.00· ESCO/ISCO 9621
IS WORK OVER?
Electrical engineer
25%
#236 / 633
View rankingElectrical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, single-line diagram and selectivity.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Project, quantities and electrical spec.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Site, contractors and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Measurements, thermography and faults.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Code, quality and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign and own the installation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- install wiring
- electrical panels
- repair faults
- Project, quantities and electrical spec
- Site, contractors and commissioning
- Measurements, thermography and faults
- Code, quality and documentation
- Sign and own the installation
- ingeniero electrico
Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151