Automation index
How much of a Bellhop’s job can AI already do?
A luggage tag comes earlier. Getting them up whole without losing the one at the back do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Bellhop
19%
AI can already do 19% of this job.
#573 / 743
View rankingBellhop
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tag, bags and the floor map.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Up, the lift and the one that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Room, the VIP and not going in unannounced.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Tip, the shift and the one who hides.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The group, the coach and not leaving one in the lobby.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Whole, and not losing the one at the back.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- bags
- floors
- the lift
- VIP
- tips
- lobby
- groups
- luggage tags
Sources for this job· O*NET 43-4081.00· ESCO/ISCO 9621
IS WORK OVER?
Geotechnical engineer
22%
#398 / 743
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142