IS WORK OVER?

Automation index

How much of a Bellhop’s job can AI already do?

A luggage tag comes earlier. Getting them up whole without losing the one at the back do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Bellhop

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Tag, bags and the floor map.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Up, the lift and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Room, the VIP and not going in unannounced.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Tip, the shift and the one who hides.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The group, the coach and not leaving one in the lobby.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Whole, and not losing the one at the back.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • bags
  • floors
  • the lift
  • VIP
  • tips
  • lobby
  • groups
  • luggage tags

Sources for this job· O*NET 43-4081.00· ESCO/ISCO 9621

Power engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Study, the short-circuit and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Substation, the disconnector and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Switching, the five rules and not skipping them.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fault, the relay and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not blow, and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • short-circuits
  • selectivity
  • disconnectors
  • five rules
  • relays
  • substations
  • lockouts
  • not work live

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Analyse my job

Jobs with similar scores

  1. 577Geriatric aide19%
  2. 578Dental assistant19%
  3. 579Embroiderer19%
  4. 581Ship captain19%
  5. 582Ceramicist19%
  6. 583Executive chef19%