Automation index
How much of a Bellhop’s job can AI already do?
A luggage tag comes earlier. Getting them up whole without losing the one at the back do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Bellhop
19%
AI can already do 19% of this job.
#491 / 643
View rankingBellhop
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tag, bags and the floor map.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Up, the lift and the one that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Room, the VIP and not going in unannounced.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Tip, the shift and the one who hides.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The group, the coach and not leaving one in the lobby.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Whole, and not losing the one at the back.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- bags
- floors
- the lift
- VIP
- tips
- lobby
- groups
- luggage tags
Sources for this job· O*NET 43-4081.00· ESCO/ISCO 9621
IS WORK OVER?
Switchboard operator
27%
#192 / 643
View rankingSwitchboard operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Board, destinations and the shift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
The call, the one who is out and the message.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Emergencies, the anger and not losing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Directory, changes and not putting through wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the queues and not hanging up.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Put it through, and not hanging up on the one who waits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- switchboard
- destinations
- messages
- directory
- call queues
- emergencies
- telephony shifts
- extension changes
Sources for this job· O*NET 43-2021.00· ESCO/ISCO 4223