Automation index
How much of a Billing clerk’s job can AI already do?
An ERP comes earlier. Issuing the right invoice without blocking the client do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Billing clerk
27%
AI can already do 27% of this job.
#152 / 623
View rankingBilling clerk
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Orders, delivery notes and the invoice.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
VAT, withholdings and the one that does not square.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Credit notes, the credit and the client who argues.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Close, the immediate supply and the deadline.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Sales, the extra and not over-billing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The right invoice, and not blocking the client.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- delivery notes
- invoices
- VAT
- credit notes
- immediate supply
- billing close
- withholdings
- orders
Sources for this job· O*NET 43-3021.00· ESCO/ISCO 4311
IS WORK OVER?
Carpenter
27%
#137 / 623
View rankingCarpenter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Follow established safety rules and regulations and maintain a safe and clean environment.EstimateNo public source provides a precise figure. This is our estimate. | 9% | 28% | +2.5 |
Measure and mark cutting lines on materials, using a ruler, pencil, chalk, and marking gauge.EstimateNo public source provides a precise figure. This is our estimate. | 9% | 28% | +2.5 |
Shape or cut materials to specified measurements, using hand tools, machines, or power saws.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 28% | +2.2 |
Assemble and fasten materials to make frameworks or props, using hand tools and wood screws, nails, dowel pins, or glue.EstimateNo public source provides a precise figure. This is our estimate. | 7% | 28% | +2 |
Build or repair cabinets, doors, frameworks, floors, or other wooden fixtures used in buildings, using woodworking machines, carpenter's hand tools, or power tools.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 12% | +0.7 |
Study specifications in blueprints, sketches, or building plans to prepare project layout and determine dimensions and materials required.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 28% | +1.7 |
Install structures or fixtures, such as windows, frames, floorings, trim, or hardware, using carpenters' hand or power tools.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 28% | +1.4 |
Verify trueness of structure, using plumb bob and level.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 28% | +1.4 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source provides a precise figure. This is our estimate. | 45% | 28% | +12.6 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- install locks
- work ergonomically
- apply proofing membranes
- cut insulation material to size
- use shims
- inspect construction supplies
- manipulate glass
- use measurement instruments
- apply insulation strips
- use safety equipment in construction
Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115