IS WORK OVER?

Automation index

How much of a BIM modeller’s job can AI already do?

A model and a clash come earlier. The site being able to build from that model do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

BIM modeller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, families and clash detection.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
IFC, BEP and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Site, the one who will not open the model, and the meeting.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quantities, parameters and the 4D nobody uses.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The last-minute change and not breaking the federated model.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be built, and not over-modelling.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • BIM modelling
  • clash detection
  • Revit families
  • IFC
  • BEP
  • coordinate trades
  • BIM quantities
  • federated model

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Printing press operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Preflight, imposition and colour profiles.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Calibrate, ink and start the press.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Watch register, density and defects on the run.
Estimate

No public source provides a precise figure. This is our estimate.

18%22%+4
Job change, plates and wash-up.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Finishing, guillotine and delivery.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Stock, times and liability for the run.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • run offset
  • calibrate colour
  • preflight files
  • watch register
  • ink the press
  • avoid wasting the run
  • imposition
  • change plates

Sources for this job· O*NET 51-5112.00· ESCO/ISCO 7322

Analyse my job

Jobs with similar scores

  1. 106Store manager28%
  2. 107Government lawyer28%
  3. 108Mathematician28%
  4. 110Notary clerk28%
  5. 111Demand planner28%
  6. 112Route planner28%