IS WORK OVER?

Automation index

How much of a BIM modeller’s job can AI already do?

A model and a clash come earlier. The site being able to build from that model do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

BIM modeller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, families and clash detection.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
IFC, BEP and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Site, the one who will not open the model, and the meeting.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quantities, parameters and the 4D nobody uses.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The last-minute change and not breaking the federated model.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be built, and not over-modelling.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • BIM modelling
  • clash detection
  • Revit families
  • IFC
  • BEP
  • coordinate trades
  • BIM quantities
  • federated model

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Ski instructor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Level, kit and the group.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Run, the turn and the one who cuts across.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fall, the one who cries and getting them up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Snow, the storm and closing in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The queue, the pass and not losing a child.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Down whole, and taking nobody with them.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • turns
  • runs
  • falls
  • snow groups
  • the pass
  • the storm
  • get them up
  • ski levels

Sources for this job· O*NET 39-9032.00· ESCO/ISCO 3422

Analyse my job

Jobs with similar scores

  1. 106Store manager28%
  2. 107Government lawyer28%
  3. 108Mathematician28%
  4. 110Notary clerk28%
  5. 111Demand planner28%
  6. 112Route planner28%