IS WORK OVER?

Automation index

How much of a BIM modeller’s job can AI already do?

A model and a clash come earlier. The site being able to build from that model do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

BIM modeller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, families and clash detection.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
IFC, BEP and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Site, the one who will not open the model, and the meeting.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quantities, parameters and the 4D nobody uses.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The last-minute change and not breaking the federated model.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be built, and not over-modelling.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • BIM modelling
  • clash detection
  • Revit families
  • IFC
  • BEP
  • coordinate trades
  • BIM quantities
  • federated model

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Tram driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Checks, log and the cab.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, stops and the pedestrian who steps out.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Badly parked car, calls and Control.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Timetable, reliefs and rush hour.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The tourist, the bike and not over-hooting.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Hit nobody, and make the terminus.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive trams
  • urban stops
  • pedestrians
  • badly parked cars
  • Control
  • rush hour
  • cab checks
  • terminus

Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311

Analyse my job

Jobs with similar scores

  1. 106Store manager28%
  2. 107Government lawyer28%
  3. 108Mathematician28%
  4. 110Notary clerk28%
  5. 111Demand planner28%
  6. 112Route planner28%