IS WORK OVER?

Automation index

How much of a BIM modeller’s job can AI already do?

A model and a clash come earlier. The site being able to build from that model do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

BIM modeller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, families and clash detection.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
IFC, BEP and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Site, the one who will not open the model, and the meeting.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quantities, parameters and the 4D nobody uses.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The last-minute change and not breaking the federated model.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be built, and not over-modelling.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • BIM modelling
  • clash detection
  • Revit families
  • IFC
  • BEP
  • coordinate trades
  • BIM quantities
  • federated model

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Warehouse supervisor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Docks, waves and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The team, the peak and the one who cannot keep up.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Stock, shrink and the mystery gap.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Safety, forklifts and the near miss.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late haulier and not mixing the docks.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Get the shift out, and not mixing the goods.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plan docks
  • waves
  • warehouse shift
  • shrink
  • forklifts
  • near misses
  • outbound peaks
  • mixed goods

Sources for this job· O*NET 53-1048.00· ESCO/ISCO 1324

Analyse my job

Jobs with similar scores

  1. 106Store manager28%
  2. 107Government lawyer28%
  3. 108Mathematician28%
  4. 110Notary clerk28%
  5. 111Demand planner28%
  6. 112Route planner28%