Automation index
How much of a BIM modeller’s job can AI already do?
A model and a clash come earlier. The site being able to build from that model do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
BIM modeller
28%
AI can already do 28% of this job.
#109 / 623
View rankingBIM modeller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, families and clash detection.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
IFC, BEP and trade coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Site, the one who will not open the model, and the meeting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quantities, parameters and the 4D nobody uses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The last-minute change and not breaking the federated model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it can be built, and not over-modelling.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- BIM modelling
- clash detection
- Revit families
- IFC
- BEP
- coordinate trades
- BIM quantities
- federated model
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118
IS WORK OVER?
Wastewater-plant operator
19%
#514 / 623
View rankingWastewater-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flow, process and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Basin, the sludge and the one that goes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Breakdown, the pump and at night.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Test, the discharge and not hiding the spike.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The rain, the overflow and not opening extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come out clean, and the sludge in place.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- works flow
- sludge
- basins
- pumps
- discharges
- overflows
- plant logs
- final tests
Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132