Automation index
How much of a Biochemist’s job can AI already do?
A protocol and a curve come earlier. An assay that says what it says does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Biochemist
24%
AI can already do 24% of this job.
#259 / 633
View rankingBiochemist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocols, curves and analysis.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Bench, pipettes and assays.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Team, paper and not dressing a gel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, lots and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Rules, waste and safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not publishing a result that does not replicate.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Protocols, curves and analysis
- Bench, pipettes and assays
- Team, paper and not dressing a gel
- Quality, lots and documentation
- Rules, waste and safety
- bioquimico
- biochemist
Sources for this job· O*NET 19-1021.00· ESCO/ISCO 2131
IS WORK OVER?
Civil engineer
25%
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142