Automation index
How much of a Biochemist’s job can AI already do?
A protocol and a curve come earlier. An assay that says what it says does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Biochemist
24%
AI can already do 24% of this job.
#259 / 633
View rankingBiochemist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocols, curves and analysis.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Bench, pipettes and assays.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Team, paper and not dressing a gel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, lots and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Rules, waste and safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not publishing a result that does not replicate.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Protocols, curves and analysis
- Bench, pipettes and assays
- Team, paper and not dressing a gel
- Quality, lots and documentation
- Rules, waste and safety
- bioquimico
- biochemist
Sources for this job· O*NET 19-1021.00· ESCO/ISCO 2131
IS WORK OVER?
Cloud architect
28%
#82 / 633
View rankingCloud architect
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagrams, ADRs and a first IaC pass.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Cost estimate, Well-Architected and gaps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Review PRs, security and network.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 20% | +3.2 |
Align with security, finops and product.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
PoCs, real failures and vendor limits.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sign the design and own the incident.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Diagrams, ADRs and a first IaC pass
- Cost estimate, Well-Architected and gaps
- Review PRs, security and network
- Align with security, finops and product
- PoCs, real failures and vendor limits
- Sign the design and own the incident
- arquitecto cloud
Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511