Automation index
How much of a Biochemist’s job can AI already do?
A protocol and a curve come earlier. An assay that says what it says does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Biochemist
24%
AI can already do 24% of this job.
#259 / 633
View rankingBiochemist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocols, curves and analysis.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Bench, pipettes and assays.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Team, paper and not dressing a gel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, lots and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Rules, waste and safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not publishing a result that does not replicate.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Protocols, curves and analysis
- Bench, pipettes and assays
- Team, paper and not dressing a gel
- Quality, lots and documentation
- Rules, waste and safety
- bioquimico
- biochemist
Sources for this job· O*NET 19-1021.00· ESCO/ISCO 2131
IS WORK OVER?
CNC machinist
24%
#275 / 633
View rankingCNC machinist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Program, simulate and document the cycle.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Work orders, paper metrology and batches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set up, set zeros and start.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 14% | +2.8 |
Measure, adjust and not break a tool.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Maintenance, swarf and safety.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Talk to engineering when the drawing lies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Program, simulate and document the cycle
- Work orders, paper metrology and batches
- Set up, set zeros and start
- Measure, adjust and not break a tool
- Maintenance, swarf and safety
- Talk to engineering when the drawing lies
- cnc
- operario cnc
- fresador
- tornero cnc
Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223