Automation index
How much of a Biochemist’s job can AI already do?
A protocol and a curve come earlier. An assay that says what it says does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Biochemist
24%
AI can already do 24% of this job.
#293 / 733
View rankingBiochemist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocols, curves and analysis.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Bench, pipettes and assays.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Team, paper and not dressing a gel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, lots and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Rules, waste and safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not publishing a result that does not replicate.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Protocols, curves and analysis
- Bench, pipettes and assays
- Team, paper and not dressing a gel
- Quality, lots and documentation
- Rules, waste and safety
- bioquimico
- biochemist
Sources for this job· O*NET 19-1021.00· ESCO/ISCO 2131
IS WORK OVER?
Geotechnical engineer
22%
#391 / 733
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142