Automation index
How much of a Biogas technician’s job can AI already do?
A methane reading comes earlier. Producing without the gasholder going up do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Biogas technician
19%
AI can already do 19% of this job.
#661 / 763
View rankingBiogas technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Feed, methane and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Digester, the pH and the one that stops.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Gasholder, the seal and the leak.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Sludge, the fate and not mixing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The smell, the neighbour and not hiding the leak.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Produce, and not going up.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- methane
- digesters
- gasholder
- sludge pH
- gas leaks
- plant feed
- smell
- seals
Sources for this job· O*NET 51-8099.00· ESCO/ISCO 3134
IS WORK OVER?
Geomatics engineer
22%
#412 / 763
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165