Automation index
How much of a Biogas technician’s job can AI already do?
A methane reading comes earlier. Producing without the gasholder going up do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Biogas technician
19%
AI can already do 19% of this job.
#538 / 633
View rankingBiogas technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Feed, methane and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Digester, the pH and the one that stops.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Gasholder, the seal and the leak.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Sludge, the fate and not mixing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The smell, the neighbour and not hiding the leak.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Produce, and not going up.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- methane
- digesters
- gasholder
- sludge pH
- gas leaks
- plant feed
- smell
- seals
Sources for this job· O*NET 51-8099.00· ESCO/ISCO 3134
IS WORK OVER?
Piling operator
19%
#521 / 633
View rankingPiling operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, level and each pile’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive, bore and refusal.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Cage, pour and the tube that rides up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vibration, the neighbour and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Plant, access and the one that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
To level, and not cracking party walls.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive piles
- bore
- cages
- refusal level
- site vibration
- pour piles
- piling set-out
- recoverable tubes
Sources for this job· O*NET 47-2073.00· ESCO/ISCO 7114