IS WORK OVER?

Automation index

How much of a Biogas technician’s job can AI already do?

A methane reading comes earlier. Producing without the gasholder going up do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Biogas technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Feed, methane and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Digester, the pH and the one that stops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Gasholder, the seal and the leak.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Sludge, the fate and not mixing.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The smell, the neighbour and not hiding the leak.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Produce, and not going up.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • methane
  • digesters
  • gasholder
  • sludge pH
  • gas leaks
  • plant feed
  • smell
  • seals

Sources for this job· O*NET 51-8099.00· ESCO/ISCO 3134

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 639Wind-turbine technician19%
  2. 640Histology technician19%
  3. 641Battery technician19%
  4. 643Early childhood technician19%
  5. 644Biomedical equipment technician19%
  6. 645Sterile processing technician19%