Automation index
How much of a Biogas technician’s job can AI already do?
A methane reading comes earlier. Producing without the gasholder going up do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Biogas technician
19%
AI can already do 19% of this job.
#651 / 753
View rankingBiogas technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Feed, methane and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Digester, the pH and the one that stops.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Gasholder, the seal and the leak.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Sludge, the fate and not mixing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The smell, the neighbour and not hiding the leak.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Produce, and not going up.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- methane
- digesters
- gasholder
- sludge pH
- gas leaks
- plant feed
- smell
- seals
Sources for this job· O*NET 51-8099.00· ESCO/ISCO 3134
IS WORK OVER?
Site engineer
19%
#606 / 753
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142