Automation index
How much of a Biomedical engineer’s job can AI already do?
A protocol and a model come earlier. Kit that does not fail in theatre does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Biomedical engineer
25%
AI can already do 25% of this job.
#230 / 623
View rankingBiomedical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Design, validate and document clinical devices and software.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Tests, MDR and risk.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hospital, clinicians and maintenance.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vendors, quality and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
User training and post-market watch.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not putting a half-built prototype in theatre.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- care for patients
- diagnose
- nursing care
- clinical notes
- Tests, MDR and risk
- Hospital, clinicians and maintenance
- Vendors, quality and traceability
- User training and post-market watch
- ingeniero biomedico
- biomedical engineer
Sources for this job· O*NET 17-2031.00· ESCO/ISCO 2149
IS WORK OVER?
Aerial technician
18%
#542 / 623
View rankingAerial technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bookings, levels and install logs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Roof, mast, cable and outlet.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Configure, tune and explain to the neighbour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Community, porter and access.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Faults, building ICT and fibre.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not falling and not leaving a building without the match.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Bookings, levels and install logs
- Roof, mast, cable and outlet
- Community, porter and access
- Faults, building ICT and fibre
- antenista
- instalador de antenas
- aerial technician
Sources for this job· O*NET 49-2022.00· ESCO/ISCO 7422