Automation index
How much of a Biomedical equipment technician’s job can AI already do?
A calibration ticket comes earlier. The ventilator working at three in the morning do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Biomedical equipment technician
19%
AI can already do 19% of this job.
#644 / 743
View rankingBiomedical equipment technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Ticket, the inventory and the calibration.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
ICU, the ventilator and not switching off the one that is ventilating.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Theatre, the stack and the one that fails at induction.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Part, the spare and the one that does not arrive.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The clinician, the rush and not leaving the kit half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it works at three, and signing the calibration.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- calibrate biomedical kit
- ventilators
- theatre stacks
- clinical inventory
- spares
- ICU
- not switch off the one ventilating
- tickets
Sources for this job· O*NET 49-9062.00· ESCO/ISCO 3211
IS WORK OVER?
Bridge engineer
22%
#391 / 743
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142