IS WORK OVER?

Automation index

How much of a Biomedical equipment technician’s job can AI already do?

A calibration ticket comes earlier. The ventilator working at three in the morning do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Biomedical equipment technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Ticket, the inventory and the calibration.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
ICU, the ventilator and not switching off the one that is ventilating.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Theatre, the stack and the one that fails at induction.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Part, the spare and the one that does not arrive.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The clinician, the rush and not leaving the kit half done.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it works at three, and signing the calibration.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calibrate biomedical kit
  • ventilators
  • theatre stacks
  • clinical inventory
  • spares
  • ICU
  • not switch off the one ventilating
  • tickets

Sources for this job· O*NET 49-9062.00· ESCO/ISCO 3211

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 641Battery technician19%
  2. 642Biogas technician19%
  3. 643Early childhood technician19%
  4. 645Sterile processing technician19%
  5. 646Hydrogen technician19%
  6. 647Nuclear medicine technologist19%