Automation index
How much of a Biomedical equipment technician’s job can AI already do?
A calibration ticket comes earlier. The ventilator working at three in the morning do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Biomedical equipment technician
19%
AI can already do 19% of this job.
#644 / 743
View rankingBiomedical equipment technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Ticket, the inventory and the calibration.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
ICU, the ventilator and not switching off the one that is ventilating.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Theatre, the stack and the one that fails at induction.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Part, the spare and the one that does not arrive.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The clinician, the rush and not leaving the kit half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it works at three, and signing the calibration.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- calibrate biomedical kit
- ventilators
- theatre stacks
- clinical inventory
- spares
- ICU
- not switch off the one ventilating
- tickets
Sources for this job· O*NET 49-9062.00· ESCO/ISCO 3211
IS WORK OVER?
Safety engineer
22%
#393 / 743
View rankingSafety engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
HAZOP, nodes and the minute.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the scenario and the one that was not thought.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
SIL, the valve and not jumping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Incident, the lesson and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Management, the cost and not yielding the interlock.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Stop, and not signing the risk that kills.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- HAZOP
- nodes
- SIL
- safety valves
- incidents
- interlocks
- safety minutes
- not jump
Sources for this job· O*NET 17-2111.00· ESCO/ISCO 2141