Automation index
How much of a Biomedical equipment technician’s job can AI already do?
A calibration ticket comes earlier. The ventilator working at three in the morning do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Biomedical equipment technician
19%
AI can already do 19% of this job.
#653 / 753
View rankingBiomedical equipment technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Ticket, the inventory and the calibration.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
ICU, the ventilator and not switching off the one that is ventilating.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Theatre, the stack and the one that fails at induction.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Part, the spare and the one that does not arrive.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The clinician, the rush and not leaving the kit half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it works at three, and signing the calibration.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- calibrate biomedical kit
- ventilators
- theatre stacks
- clinical inventory
- spares
- ICU
- not switch off the one ventilating
- tickets
Sources for this job· O*NET 49-9062.00· ESCO/ISCO 3211
IS WORK OVER?
Site engineer
19%
#606 / 753
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142