IS WORK OVER?

Automation index

How much of a Blacksmith’s job can AI already do?

A sketch comes earlier. Forging, tempering and the piece not cracking do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Blacksmith

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sketch, template and the material calc.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Forge, temper and the blow that counts.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Weld, rivet and the site fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Grilles, gates and the client’s order.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Coal, the hearth and the shop rhythm.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack, and signing the iron.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • forge
  • temper
  • grilles
  • rivet
  • iron templates
  • forge hearth
  • site fit
  • iron gates

Sources for this job· O*NET 51-4121.00· ESCO/ISCO 7221

Acoustics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reading, the map and the standard.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the insulation and what was not put in.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Simulation, the model and not trusting it alone.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Report, the neighbour and not softening the dB.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The council, the licence and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Bring it down for real, and not selling the miracle panel.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • noise maps
  • insulation
  • dB
  • acoustic simulations
  • standards
  • licences
  • neighbours
  • field readings

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 594Kayak guide19%
  2. 595Mountain guide19%
  3. 596Farrier19%
  4. 598Site engineer19%
  5. 599Shutter installer19%
  6. 600Window installer19%