IS WORK OVER?

Automation index

How much of a Blacksmith’s job can AI already do?

A sketch comes earlier. Forging, tempering and the piece not cracking do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Blacksmith

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sketch, template and the material calc.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Forge, temper and the blow that counts.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Weld, rivet and the site fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Grilles, gates and the client’s order.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Coal, the hearth and the shop rhythm.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack, and signing the iron.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • forge
  • temper
  • grilles
  • rivet
  • iron templates
  • forge hearth
  • site fit
  • iron gates

Sources for this job· O*NET 51-4121.00· ESCO/ISCO 7221

HVAC engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Loads, flows and the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the duct and the one they crushed.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Commissioning, the balance and the room that sweats.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Noise, the grille and not leaving the whistle.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the saving and not killing the fresh air.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not sweat, and not oversizing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • load calcs
  • air flows
  • ducts
  • balancing
  • grilles
  • fresh air
  • whistles
  • HVAC plant

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 612Kayak guide19%
  2. 613Mountain guide19%
  3. 614Farrier19%
  4. 616Site engineer19%
  5. 617Shutter installer19%
  6. 618Window installer19%