Automation index
How much of a Blacksmith’s job can AI already do?
A sketch comes earlier. Forging, tempering and the piece not cracking do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Blacksmith
19%
AI can already do 19% of this job.
#510 / 643
View rankingBlacksmith
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Sketch, template and the material calc.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Forge, temper and the blow that counts.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Weld, rivet and the site fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Grilles, gates and the client’s order.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Coal, the hearth and the shop rhythm.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it does not crack, and signing the iron.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- forge
- temper
- grilles
- rivet
- iron templates
- forge hearth
- site fit
- iron gates
Sources for this job· O*NET 51-4121.00· ESCO/ISCO 7221
IS WORK OVER?
Industrial engineer
28%
#102 / 643
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141