Automation index
How much of a Blacksmith’s job can AI already do?
A sketch comes earlier. Forging, tempering and the piece not cracking do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Blacksmith
19%
AI can already do 19% of this job.
#510 / 643
View rankingBlacksmith
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Sketch, template and the material calc.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Forge, temper and the blow that counts.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Weld, rivet and the site fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Grilles, gates and the client’s order.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Coal, the hearth and the shop rhythm.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it does not crack, and signing the iron.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- forge
- temper
- grilles
- rivet
- iron templates
- forge hearth
- site fit
- iron gates
Sources for this job· O*NET 51-4121.00· ESCO/ISCO 7221
IS WORK OVER?
Lathe operator
26%
#219 / 643
View rankingLathe operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read the drawing, tolerances and the route card.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Set up, clamp, pick the tool and the origin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Turn, face, thread and finish the part.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 28% | +5 |
Measure, tweak offsets and not scrap the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Lathe care, swarf and safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Grades, times and liability for the dimension.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- turn parts
- set up the lathe
- measure dimensions
- cut threads
- adjust offsets
- read mechanical drawings
- avoid scrap
- pick tools
Sources for this job· O*NET 51-4034.00· ESCO/ISCO 7223