IS WORK OVER?

Automation index

How much of a Blacksmith’s job can AI already do?

A sketch comes earlier. Forging, tempering and the piece not cracking do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Blacksmith

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sketch, template and the material calc.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Forge, temper and the blow that counts.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Weld, rivet and the site fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Grilles, gates and the client’s order.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Coal, the hearth and the shop rhythm.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack, and signing the iron.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • forge
  • temper
  • grilles
  • rivet
  • iron templates
  • forge hearth
  • site fit
  • iron gates

Sources for this job· O*NET 51-4121.00· ESCO/ISCO 7221

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 497Kayak guide19%
  2. 498Mountain guide19%
  3. 499Farrier19%
  4. 501Shutter installer19%
  5. 502Window installer19%
  6. 503Diving instructor19%