Automation index
How much of a Blacksmith’s job can AI already do?
A sketch comes earlier. Forging, tempering and the piece not cracking do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Blacksmith
19%
AI can already do 19% of this job.
#500 / 633
View rankingBlacksmith
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Sketch, template and the material calc.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Forge, temper and the blow that counts.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Weld, rivet and the site fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Grilles, gates and the client’s order.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Coal, the hearth and the shop rhythm.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it does not crack, and signing the iron.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- forge
- temper
- grilles
- rivet
- iron templates
- forge hearth
- site fit
- iron gates
Sources for this job· O*NET 51-4121.00· ESCO/ISCO 7221
IS WORK OVER?
Mining engineer
22%
#341 / 633
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146