IS WORK OVER?

Automation index

How much of a Blacksmith’s job can AI already do?

A sketch comes earlier. Forging, tempering and the piece not cracking do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Blacksmith

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sketch, template and the material calc.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Forge, temper and the blow that counts.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Weld, rivet and the site fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Grilles, gates and the client’s order.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Coal, the hearth and the shop rhythm.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack, and signing the iron.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • forge
  • temper
  • grilles
  • rivet
  • iron templates
  • forge hearth
  • site fit
  • iron gates

Sources for this job· O*NET 51-4121.00· ESCO/ISCO 7221

Prompt engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Design prompts, tools and chains.
Estimate

No public source provides a precise figure. This is our estimate.

24%58%+13.9
Evals, datasets and regressions.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Integrate with product and safety limits.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Talk to the business about a good output.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Watch hallucinations, bias and cost.
Estimate

No public source provides a precise figure. This is our estimate.

14%20%+2.8
Decide what the model gets, and what it does not.
Estimate

No public source provides a precise figure. This is our estimate.

12%16%+1.9
Total100%34%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Design prompts, tools and chains
  • Evals, datasets and regressions
  • Integrate with product and safety limits
  • Talk to the business about a good output
  • Watch hallucinations, bias and cost
  • prompt engineer
  • ingeniero de prompts
  • llm engineer

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512

Analyse my job

Jobs with similar scores

  1. 507Kayak guide19%
  2. 508Mountain guide19%
  3. 509Farrier19%
  4. 511Shutter installer19%
  5. 512Window installer19%
  6. 513Diving instructor19%