Automation index
How much of a Blacksmith’s job can AI already do?
A sketch comes earlier. Forging, tempering and the piece not cracking do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Blacksmith
19%
AI can already do 19% of this job.
#500 / 633
View rankingBlacksmith
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Sketch, template and the material calc.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Forge, temper and the blow that counts.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Weld, rivet and the site fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Grilles, gates and the client’s order.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Coal, the hearth and the shop rhythm.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it does not crack, and signing the iron.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- forge
- temper
- grilles
- rivet
- iron templates
- forge hearth
- site fit
- iron gates
Sources for this job· O*NET 51-4121.00· ESCO/ISCO 7221
IS WORK OVER?
Renewables engineer
27%
#163 / 633
View rankingRenewables engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Resource, layout and the yield model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Site, topography and the cable that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Permits, grid point and the TSO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
EPC, commissioning and export tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the council and the appeal against the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it exports, and not inflating equivalent hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plant layout
- solar resource
- grid connection
- commissioning
- renewables permits
- yield model
- export tests
- EPC
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149