IS WORK OVER?

Automation index

How much of a Blacksmith’s job can AI already do?

A sketch comes earlier. Forging, tempering and the piece not cracking do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Blacksmith

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sketch, template and the material calc.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Forge, temper and the blow that counts.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Weld, rivet and the site fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Grilles, gates and the client’s order.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Coal, the hearth and the shop rhythm.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack, and signing the iron.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • forge
  • temper
  • grilles
  • rivet
  • iron templates
  • forge hearth
  • site fit
  • iron gates

Sources for this job· O*NET 51-4121.00· ESCO/ISCO 7221

Residential porter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Shift, the sheet and the letterboxes.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hall, the neighbour and the one who is not.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fault, the water and calling it in.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Move, the lift and not scratching.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The residents, the complaint and not taking sides.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Be there when it floods, and not losing the master.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fault sheets
  • master key
  • the hall
  • letterboxes
  • floods
  • moves
  • the residents
  • not take sides

Sources for this job· O*NET 39-6012.00· ESCO/ISCO 9629

Analyse my job

Jobs with similar scores

  1. 566Kayak guide19%
  2. 567Mountain guide19%
  3. 568Farrier19%
  4. 570Shutter installer19%
  5. 571Window installer19%
  6. 572Diving instructor19%